Method
Sources and method.
Each figure on this site is declared once, with its source, the date we checked it and a trust label. This page is generated from that list, so it always matches the pages.
01Trust labels
How to read the labels.
Official source
A government body or regulator: RTA, Dubai Land Department, ICP, KHDA.
Developer
Imtiaz’s Kore factsheet and its website imtiaz.ae. Accurate for what Imtiaz states; prices and dates can change.
Reported / listing
Press reports and third-party listings, including DLD data compiled by a third party. Useful, but check before relying on it.
Kore’s prices, sizes, payment plans, completion date and amenities come from Imtiaz’s Kore factsheet (October 2026). The floor count, plot coordinates and school distances come from a third-party listing. Where a source contradicts itself — Le Blanc’s completion appears as Q2, June and Q4 2028 on the same page — we say so rather than pick one.
02Registry
Every figure, by source.
Imtiaz Developments (imtiaz.ae)Developer
KORE by Imtiaz project page · 2026-10-27 · imtiaz.ae/property/kore-by-imtiaz
- Kore — concept: a residence designed around human performance and longevity — three pillars: train, nourish, recover
- Kore — amenities listed: climate comfort garden, rooftop adults’ leisure pool, sunset deck, wellness pool, rooftop kids’ pool, shallow water feature, garden co-working pods, interactive sensory garden, conversation pit, family lounge and lawn, harvest table with pavilion, edible garden, outdoor gym, playground, social padel court, sports lounge
- Kore — prices on the page: none published
Imtiaz Developments (Kore brochure)Developer
KORE by Imtiaz — Brochure, 78 pages, marked work in progress on two pages · 2026-10-08
- Kore — gym: 3,200 sq ft — designed with Technogym, described as three times the average
- Kore — The Hike: 500 steps, about 0.15 calories a step
- Kore — Technogym check-up: six steps — body composition, mobility, balance, mind, wellness age, precision training with Technogym AI Coach
- Kore — red light therapy: eight protocols through One Hype Wellness
- Kore — sleep: every home comes with a Heveya sleep system — mattress, pillows and linens
- Kore — indoor spaces: lobby, lounge, KORE Work Station co-working, yoga space and a timber-lined sauna
Imtiaz launch brief to sales partnersDeveloper
Exclusive launch message · 2026-10-07
- Kore — building: B + G + 3P + 13 + R — basement, ground floor, three podium levels, 13 residential floors and roof
- Kore — location pin: Google Maps, “Kore by IMTIAZ” — 25.088721, 55.377983
Property portalsThird-party listing
Property Finder project page and Bayut listings · 2026-10-27 · propertyfinder.ae · bayut.com
- Kore — expected booking date and construction start: 15 November 2026 — Property Finder
- Kore — completion: December 2028 (14 Dec 2028 in the timeline) — Property Finder
- Kore — sizes shown: 1-bed from 689 sq ft, 2-bed from AED 1.6M — Property Finder; the factsheet gives 669 sq ft and AED 1.55M
- Kore — sale listings: 265 — Bayut; asking prices on the first page from AED 649,999 (studio) to AED 1.55M (2-bed)
Third-party listing (hcorealestates.com)Third-party listing
Kore by Imtiaz at DLRC — project listing (updated 11 Aug 2026) · 2026-08-11 · hcorealestates.com/project/imtiaz-kore
- Kore — levels recorded for the plot: 17 — the ground floor, three podium levels and 13 residential floors; one basement parking level below
- Kore — plot coordinates: 25.088642, 55.377941
- Kore — distance to GEMS FirstPoint School: about 100 m
- Kore — distance to The Aquila School: about 500 m
- Kore — shops within 200 m: a pharmacy, mini-mart, café and restaurant
- Drive to the E66 Dubai–Al Ain Road: about 3 min
- Drive to Dubai International Academic City: about 5 min
- Drive to Dubai Silicon Oasis: 5–8 min — the listing gives both figures
- Drive to Global Village: about 10 min
- Drive to Al Maktoum International Airport (DWC): about 30 min
- Retail outlets trading in DLRC: about 140 — incl. 35 restaurants, 12 mini-marts, 6 supermarkets, 5 pharmacies, 3 nurseries, 2 clinics
- DLRC roads and landscaping completed: January 2023
- DLRC parks: two mid-sized parks (2023) and two smaller parks with sports areas (March 2025)
- Building developments recorded in DLRC: 213 — construction will continue around the community for years
- DLRC street parking: AED 3 an hour
DLD open data (third-party compilation)Reported
DLRC sales and rental registrations, Dubai Land Department open data, as compiled in a third-party listing · 2026-08-11 · hcorealestates.com/project/imtiaz-kore
- DLRC apartments — average gross yield: 6.59% — average registered rent ÷ average sale price
- DLRC apartments — average sale price: AED 811,536
- DLRC apartments — average annual rent: AED 53,509
- DLRC apartment values — six-month change: +7%
- DLRC apartment sales in twelve months: 6,624
- DLRC leases registered in twelve months: 2,850
- DLRC off-plan studios registered 31 July 2026 — price per sq ft: AED 1,232–1,732 — three studio sales on one day
- DLRC ready 1-bed registered 31 July 2026 — price per sq ft: AED 754 — one completed unit (Skycourts Tower A)
Imtiaz Developments (imtiaz.ae)Developer
About us · 2026-09-28 · imtiaz.ae/about-us
- Imtiaz — founded: 1993 — began as a construction business
- Imtiaz — developments: 40+
- Imtiaz — CEO: Masih Ullah Imtiaz
- Imtiaz — chairman: Ustad Rahimullah Shahsawar
- Imtiaz — legal name: Imtiaz Real Estate Investment and Development LLC
- Imtiaz — philanthropy: Mohammed bin Rashid Al Maktoum Medal for Philanthropy (March 2025) — linked to an AED 50 million donation to the Fathers’ Endowment
Imtiaz Developments (imtiaz.ae)Developer
Dubai Land Residence Complex community page · 2026-10-27 · imtiaz.ae/community/dubai-land-residence-complex-1
- Kore on the developer's website: listed as KORE by Imtiaz — imtiaz.ae/property/kore-by-imtiaz, with concept, amenities, gallery and map; no prices
- Imtiaz projects in DLRC listed by the developer: 12 projects — Cove, Cove Edition I–6, Cove Grand, Cove Boulevard, Le Blanc, The Archive and KORE by Imtiaz
Imtiaz Developments (imtiaz.ae)Developer
Cove Grand by Imtiaz · 2026-09-28 · imtiaz.ae/property/cove-grand-by-imtiaz
- Cove Grand — studio from: AED 690,000 — from 386 sq ft
- Cove Grand — 1-bedroom from: AED 988,000 — from 707 sq ft
- Cove Grand — 2-bedroom from: AED 1,430,000 — from 1,282 sq ft
- Cove Grand — 3-bedroom from: AED 1,920,000 — from 1,627 sq ft
- Cove Grand — studio size from: 386 sq ft
- Cove Grand — 1-bedroom size from: 707 sq ft
- Cove Grand — 2-bedroom size from: 1,282 sq ft
- Cove Grand — 3-bedroom size from: 1,627 sq ft
- Cove Grand — configuration: 1B + G + 3P + 17 floors + roof
- Cove Grand — estimated completion: Q4 2027
- Cove Grand — payment plans: 50/50, or 70/30 with 30% over 3 years after handover
- Cove Grand — construction progress: 15% — checked 27 Oct 2026
Imtiaz Developments (imtiaz.ae)Developer
Le Blanc by Imtiaz · 2026-09-28 · imtiaz.ae/property/le-blanc-by-imtiaz-1
- Le Blanc — configuration: B + G + 3P + 17 floors + roof
- Le Blanc — units: 323 — 187 studios, 102 one-bed, 17 two-bed, 17 three-bed
- Le Blanc — completion: 2028 — the page gives Q2 2028, June 2028 and Q4 2028 in different places
- Le Blanc — payment plans: 60/40, or 70/30 with 30% over 3 years after handover
- Le Blanc — construction progress: 9%
Imtiaz Developments (imtiaz.ae)Developer
Cove Edition 6 by Imtiaz · 2026-09-28 · imtiaz.ae/property/cove-edition-6-by-imtiaz-1
- Cove Edition 6 — estimated completion: Q4 2027
- Cove Edition 6 — construction progress: 30% — checked 27 Oct 2026
Imtiaz Developments (imtiaz.ae)Developer
Cove Edition 5 by Imtiaz · 2026-09-28 · imtiaz.ae/property/cove-edition-5-by-imtiaz
- Cove Edition 5 — completion: June 2027
- Cove Edition 5 — configuration: 2B + G + 11 floors + roof
- Cove Edition 5 — post-handover plan: 20% on booking, construction instalments, 30% over 3 years at 2.5% a quarter
Imtiaz Developments (imtiaz.ae)Developer
Cove Boulevard by Imtiaz · 2026-09-28 · imtiaz.ae/property/cove-boulevard-by-imtiaz
- Cove Boulevard — configuration: 2B + G + 4P + 30 floors + roof
- Cove Boulevard — units: 436 — 287 apartments and 149 offices
- Cove Boulevard — estimated completion: Q2 2028
- Cove Boulevard — payment plans: 60/40, or 70/30 with 30% over 3 years after handover
Imtiaz Developments (imtiaz.ae)Developer
The Archive by Imtiaz · 2026-09-28 · imtiaz.ae/property/the-archive-by-imtiaz
- The Archive — published details: no price, unit mix or completion date published
- The Archive — amenities: mini-golf, adult and kids’ pools, floating cabana, gym, library, reading corners, outdoor cinema
- The Archive — finish: furnished
Imtiaz Developments (imtiaz.ae)Developer
Cove by Imtiaz · 2026-09-28 · imtiaz.ae/property/cove-by-imtiaz
- Cove — estimated completion: Q1 2027
- Cove — construction progress: 56% — checked 27 Oct 2026
Khaleej Times (RTA announcement)Official source
Dubai Metro Blue Line to be completed on September 9, 2029, RTA announces · 2024-12-19 · khaleejtimes.com/uae/transport/dubai-metro-blue-line-to-be-completed-s
- Dubai Metro Blue Line opening: 9 September 2029
- Blue Line length: 30 km
- Blue Line stations: 14 stations
- Blue Line contract value: AED 20.5 billion
- Blue Line stations near DLRC: Dubai Silicon Oasis and Academic City
RTA DubaiOfficial source
Blue Line route announcement · 2023-11-25 · x.com/rta_dubai/status/1728307855680225690
- Blue Line interchanges: Creek (Green Line), Centrepoint (Red Line) and International City 1
Gulf NewsReported
Imtiaz sells out Dh2 billion RAW District project on launch day · 2026-06-22 · gulfnews.com/business/property/imtiaz-sells-out-dh2-billion-raw-distri
- RAW District launch: AED 2 billion, sold out on launch day — 22 June 2026, Downtown Jebel Ali
Gulf NewsReported
Imtiaz records another launch-day sell-out with Dh1.5 billion RAW District 2 · 2026-07-27 · gulfnews.com/business/property/imtiaz-records-another-launch-day-sell-
- RAW District 2 launch: AED 1.5 billion, sold out on launch day — 27 July 2026
Gulf NewsReported
Imtiaz Developments unveils Dh1 billion The Symphony in Meydan with Zaha Hadid Architects · 2025-12 · gulfnews.com/amp/story/business/corporate-news/imtiaz-developments-unv
- The Symphony, Meydan: AED 1 billion, designed with Zaha Hadid Architects — completion targeted Q2 2029
Zawya (developer press release)Reported
Imtiaz Developments hands over Pearl House II in JVC three months early · 2025 · zawya.com/en/press-release/companies-news/imtiaz-developments-hands-ov
- Pearl House II, JVC: handed over three months early — Q3 2025
Dubai Land DepartmentOfficial source
Property sale registration — fees · 2026-09-28 · dubailand.gov.ae/en/eservices/property-sale-registration/
- Dubai Land Department registration fee: 4% of the price — split 2% + 2% in DLD’s schedule; buyers commonly pay all 4% by contract on off-plan
- Title deed fee (ready property): AED 250
- Registration trustee fee (ready property): AED 4,000 + VAT — AED 2,000 + VAT below AED 500,000
Dubai Land DepartmentOfficial source
Request to register the initial sale (off-plan) · 2026-09-28 · dubailand.gov.ae/en/eservices/request-to-register-the-initial-sale/
- DLD knowledge and innovation fees: AED 10 + AED 10
- Off-plan (Oqood) registration deadline: within 60 days — the developer registers the initial sale once the buyer pays the 4%
Federal Authority for Identity, Citizenship, Customs & Port Security (ICP)Official source
UAE Golden Residency · 2026-09-28 · icp.gov.ae/en/services/uae-golden-residency/
- Golden Visa property threshold: AED 2 million — 10-year renewable residency
- Golden Visa — off-plan property: qualifies if the off-plan units total AED 2 million from an approved developer
KHDAOfficial source
GEMS FirstPoint School — school details · 2026-09-28 · web.khda.gov.ae/en/Education-Directory/Schools/School-Details?Id=4439&
- GEMS FirstPoint School — KHDA rating: Very Good — UK curriculum; 2023–24 inspection, the latest
KHDAOfficial source
The Aquila School — school details · 2026-09-28 · web.khda.gov.ae/en/Education-Directory/Schools/School-Details?Id=5509&
- The Aquila School — KHDA rating: Good — listed as IB curriculum; 2023–24 inspection, the latest
Khaleej TimesReported
Dubai: KHDA halts school inspections for next academic year · 2024-06-22 · khaleejtimes.com/uae/education/dubai-khda-halts-school-inspections-for
- KHDA inspections 2024–25: paused; the latest ratings still apply
Khaleej TimesReported
Dubailand Residence Complex emerges as Dubai's fastest-rising mid-market magnet · 2026-02-17 · khaleejtimes.com/business/dubailand-residence-complex-emerges-as-dubai
- E66 and E611 access: between the E66 and the E611 — Dubai–Al Ain Road and Emirates Road
Propsearch (DLD data)Reported
Wadi Al Safa 5 (DLD area) · 2026-09-28 · propsearch.ae/dubai/wadi-al-safa-5
- Kore — DLD area: Wadi Al Safa 5 — the Dubai Land Department area that contains DLRC
- DLRC ownership: freehold, open to foreign buyers — confirm per plot with DLD’s property status enquiry
Imtiaz Developments (Kore factsheet)Developer
Kore by Imtiaz — Factsheet (17 pages) · 2026-10-27
- Kore — stage: off-plan — on sale; completion Q4 2028
- Kore — amenities: rooftop pools, Raw Theory gym, padel court, edible garden, sauna, red light therapy, co-working pods and playground
- Drive to Downtown Dubai: 20 minutes
- Drive to Dubai International Airport (DXB): 20 minutes
- Kore — studio starting price: AED 679,000 — from 406 sq ft
- Kore — 1-bedroom starting price: AED 1.1 million — from 669 sq ft
- Kore — 2-bedroom starting price: AED 1.55 million — from 1,406 sq ft
- Kore — studio size from: 406 sq ft
- Kore — 1-bedroom size from: 669 sq ft
- Kore — 2-bedroom size from: 1,406 sq ft
- Kore — unit types: studios, 1-bedroom and 2-bedroom apartments — no 3-bedroom is listed
- Kore — completion: Q4 2028 — instalment dates are marked * in the factsheet
- Kore — booking instalment: 20% — both payment plans
- Kore — 50/50 payment plan: 20% on booking, six 5% instalments to September 2028, 50% on completion — instalments 15 Feb, 15 Jun, 15 Oct 2027; 15 Feb, 15 Apr, 15 Sep 2028
- Kore — 60/40 post-handover plan: 60% by completion, then 40% over 3 years — 20% booking; 5%, 10%, 5%, 10%, 5% to April 2028; 5% on completion
- Kore — post-handover instalments: 3.33% a quarter for 3 years — 40% in total after handover
- Kore — concept: a holistic wellness residence designed around human performance and longevity — three pillars: Train, Nourish, Recover
- Kore — the name: from the word “core” — the body’s centre of strength and stability
- Kore — gym operator: Raw Theory — on the ground level and the roof
- Kore — gym equipment: Technogym — connected cardio, strength and functional training with personalised programmes
- Kore — gym machines: 50 machines
- Kore — The Hike: a signature staircase: 500 steps at about 0.15 calories a step — designed to make climbing the default over the lift
- Kore — recovery partner: One Hype Wellness — brain mapping, hyperbaric oxygen and red light therapy, coordinated through One AI
- Kore — sleep system: Heveya — three layers of natural organic latex topped with goose down
- Kore — interiors: natural bamboo and oak, woven textures, stone and fluted panelling
- Kore — orientation: planned for optimised sunlight exposure — “vitamin-daylight” in the factsheet
- Kore — rooftop: adults’ leisure pool, wellness pool, kids’ pool, sunset deck, clubhouse and Raw Theory gym
- Kore — Level 1 podium: social padel court, outdoor gym, edible garden with harvest table, sensory garden, co-working pods, playground and family lawn
- Drive to Al Habtoor Polo Resort: 10 minutes
- Drive to Meydan (racecourse, golf, cycling track, Wellfit): 15 minutes
- Drive to Hamdan Sports Complex: 15 minutes
- Drive to Ras Al Khor Wildlife Sanctuary: 15 minutes
- Drive to Nad Al Sheba Cycling Park: 20 minutes
- Drive to Dubai Creek Harbour: 20 minutes
- Drive to Business Bay and Dubai Design District: 20 minutes
Enquire
Get Kore’s price list and floor plans.
Leave your details once. You receive current availability, the unit-by-unit price list, floor plans and both payment schedules.