Studios from AED 679,000 · 20% on booking · completion Q4 2028Independent guide · facts checked 2026-10-27
Kore by ImtiazPrice, Floor Plans & Payment Plan · DLRC, Dubailand

Compare

Kore vs Le Blanc by Imtiaz.

Two Imtiaz towers of almost the same size in DLRC. One is built around wellness and launches now; the other is minimalist, has three-bedrooms and is already under construction.

Updated

White residential tower with vertical fins rising above palm-lined landscaping at dusk, Le Blanc by Imtiaz in DLRC
Render: Le Blanc by Imtiaz, DLRC. Not Kore

Get both price lists

Current availability, unit-by-unit prices, floor plans and both payment schedules. Free, no obligation.

One adviser replies · no spam · no obligation

01Short answer

The difference in one paragraph.

The short answer

Kore and Le Blanc are Imtiaz towers of similar size in DLRC: 351 and 323 homes. Le Blanc is a minimalist, all-white building with studios to three-bedrooms, 9% built, with an estimated completion in 2028. Kore is a wellness-led building with studios to two-bedrooms, launching in October 2026 for completion in Q4 2028. Kore publishes its starting prices; imtiaz.ae does not show Le Blanc’s.

02Side by side

What each has published.

Kore by ImtiazLe Blanc by Imtiaz
ConceptWellness: train, nourish, recoverMinimal design, “beauty in simplicity”
Homes351: 248 studios, 90 one-bed, 13 two-bed323: 187 studios, 102 one-bed, 17 two-bed, 17 three-bed
BuildingB + G + 3P + 13 floors + roofB + G + 3P + 17 floors + roof
Starting priceStudio from AED 679,000Not shown on imtiaz.ae
StatusRevealed 8 Oct 2026; construction start listed for 15 Nov 20269% built
CompletionQ4 2028Q2 2028 on the progress panel; Q4 2028 in the page’s FAQ
Payment plans50/50, or 60/40 with 40% over 3 years after handover60/40, or 70/30 with 30% over 3 years after handover
RooftopThree pools, sunset deck, clubhouse, Raw Theory gymPool, gym, clubhouse, outdoor cinema
SignatureRaw Theory gym, padel court, recovery suite, edible gardenOutdoor cinema, outdoor dining and BBQ, kids’ zone
Kore: Imtiaz’s Kore factsheet, Oct 2026; reveal invitation, 1 Oct 2026, and launch brief, 7 Oct 2026; Dubai Land Department project record, checked 1 Oct 2026. Le Blanc: imtiaz.ae, checked 6 Oct 2026.

Imtiaz’s Le Blanc page gives three completion references: Q2 2028 beside the construction progress, June 2028 in the payment plan and Q4 2028 in its FAQ. Ask for the date written in the sales and purchase agreement.

03Unit mix

Two studio-heavy towers, one difference.

71%

Of Kore’s recorded homes are studios (248 of 351)

58%

Of Le Blanc’s homes are studios (187 of 323)

34

Two- and three-bedrooms at Le Blanc

13

Two-bedrooms at Kore; no three-bedroom

Both buildings are aimed at the studio and one-bedroom buyer. Le Blanc has more family-sized homes, 34 against 13, and is the only one of the two with three-bedrooms. Kore’s few two-bedrooms are correspondingly rare inside their own building.

04Verdict

Which one for whom.

Choose Kore if

  • The wellness programme matters to youA Raw Theory gym with 50 Technogym machines, a padel court and recovery by One Hype Wellness are Kore’s reason to exist.
  • You want less cash before the keysKore’s 60/40 plan leaves 40% until after handover; Le Blanc’s post-handover option leaves 30%.
  • You want published prices todayKore’s starting prices are in the developer’s factsheet.

Choose Le Blanc if

  • You need three bedroomsLe Blanc has 17; Kore has none.
  • You want a building already under wayLe Blanc was 9% built on 6 October 2026. Kore is at launch.
  • You prefer a quieter amenity listPool, clubhouse, cinema and gym, without operator-run wellness services.

Both price lists

Le Blanc’s prices are on request. We send both.

Current availability and unit-by-unit prices for Kore and Le Blanc, with each payment schedule.

05 · Questions

Questions buyers ask

Short answers with their sources. Anything else, ask us and we reply by WhatsApp or email.

What is the difference between Kore and Le Blanc by Imtiaz?

Kore is a wellness-led building with studios to two-bedrooms, launching in October 2026. Le Blanc is a minimalist building with studios to three-bedrooms that was 9% built on 6 October 2026. Both are Imtiaz projects in DLRC.

Which is bigger, Kore or Le Blanc?

Le Blanc is taller, with 17 residential floors against Kore’s 13, but Kore has slightly more homes: 351 in the Dubai Land Department record against Le Blanc’s 323.

Which completes first, Kore or Le Blanc?

Imtiaz’s Le Blanc page shows an estimated completion of Q2 2028 beside its construction progress and Q4 2028 in its FAQ. Kore is scheduled for Q4 2028. Confirm both dates in the sale agreements.

Does Le Blanc have a post-handover payment plan?

Yes: 70/30, with 30% paid over three years after handover in quarterly instalments. Kore’s post-handover plan is 60/40, with 40% over three years.

Enquire

Get Kore’s price list and floor plans.

Leave your details once. You receive current availability, the unit-by-unit price list, floor plans and both payment schedules.

Prices & payment plans
Kore by Imtiaz: grey grid-framed residential building on a dark podium with the Downtown Dubai skyline behind, DLRC

Enquiry form